
[Nov 06, 2025] SAP Dumps - Learn How To Deal With The (E-S4HCON2023) Exam Anxiety
DEMO FREE BEFORE YOU BUY E-S4HCON2023 DUMPS
SAP E-S4HCON2023 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
NEW QUESTION # 32
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Near-Zero Downtime Technology (NZDT)
- B. Downtime Optimized DMO (DoDMO)
- C. Near-Zero Downtime Maintenance (nZDM)
- D. Downtime Optimized Data Conversion (DoC)
Answer: A
NEW QUESTION # 33
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Modification adjustment (SPDD)
- B. Activation of dictionary objects (ACT_UPG)
- C. Switch to new repository (EU_SWITCH)
- D. Conversion of application tables (PARCONVJJPG)
Answer: A,B
NEW QUESTION # 34
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages contained in the upgrade media
- B. The SAP Support Packages found in the download directory
- C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- D. The SAP Support Packages that will be bound to the upgrade
Answer: B
NEW QUESTION # 35
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. You need to build up a SI check framework by applying SAP notes.
- B. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- C. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
Answer: A,C
NEW QUESTION # 36
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Before the downtime starts
- B. Early in the downtime
- C. As part of the cleanup process
- D. At the end of the downtime
Answer: A
NEW QUESTION # 37
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During downtime
- B. Post-downtime
- C. During uptime
- D. During SPDD
Answer: B,C
NEW QUESTION # 38
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: C
NEW QUESTION # 39
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPDD)
- B. Activation of dictionary objects (ACT_UPG)
- C. Conversion of application tables (PARCONV_UPG)
- D. Modification adjustment (SPAU)
Answer: A,B
NEW QUESTION # 40
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question
- A. Check the Charts Control Center in the SUM Ul
- B. Check the log files written in the SUM directory subdirectory abap. subdirectory log
- C. Check the dump size of the database export on disk.
- D. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
Answer: B,C
NEW QUESTION # 41
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of user DDIC in client 000 of the shadow system
- C. Credentials of a named user in client 000 of the shadow system
- D. Credentials of a named user in the development client of the development system
Answer: D
NEW QUESTION # 42
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Software update
- B. Unicode conversion
- C. Custom code analysis
- D. Database migration
Answer: A,D
NEW QUESTION # 43
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.
- A. It explains where to find information about the custom code analysis.
- B. It is a database-specific document.
- C. It explains the database migration option (DMO) of SUM.
- D. It contains a section about the simplification item (SI) checks.
Answer: A,D
NEW QUESTION # 44
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
- B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- D. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
Answer: D
NEW QUESTION # 45
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:
- A. Breakpoint configuration file SAPUPPHAS.BRK
- B. MIGRATE J5T_DUR_XML file from a previous run
- C. Stack XML file calculated by the Maintenance Planner
- D. Parameter file SAPup_add.par
Answer: B,C
NEW QUESTION # 46
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Creation of the table structures in the new SAP HANA database
- B. Execution of SPDD modification adjustment
- C. Execution of XPRAs and AIMs
- D. Execution of eCATTs for business validation tests
- E. Execution of SPAU modification adjustment
Answer: C,D,E
NEW QUESTION # 47
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for source release, Windows, SAP MaxDB
- B. Kernel for target release, Windows, SAP MaxDB
- C. Kernel for target release, Windows, SAP HANA
- D. Kernel for target release, Linux, SAP HANA
Answer: A,C
NEW QUESTION # 48
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- B. You need to build up an SI check framework by applying SAP Notes
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems
- D. The errors from the SI checks must be solved, otherwise. SUM will report an error
Answer: A,B
NEW QUESTION # 49
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
- A. Migration repetition option
- B. DMO with system move
- C. Table count verification
- D. Table contents compare
Answer: B
NEW QUESTION # 50
......
Latest SAP E-S4HCON2023 Dumps with Test Engine and PDF: https://exam-labs.itpassleader.com/SAP/E-S4HCON2023-dumps-pass-exam.html