
E-S4HCON2022 Exam Dumps Free Test Engine Verified By SAP Certified Technology Specialist Certified Experts
Use Real SAP Achieve the E-S4HCON2022 Dumps - 100% Exam Passing Guarantee
E-S4HCON2022 Exam Certification Details:
| Exam: | 40 questions |
| Duration: | 90 mins |
| Languages: | English |
NEW QUESTION 10
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the main configuration option "Standard" when applying SAP Support Packages
- B. Using the main configuration option "Single System" when installing an Add-On
- C. Using the main configuration option "Single System" in case of an upgrade.
- D. Using the database migration option (DMO) for SUM
Answer: B
NEW QUESTION 11
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
Answer: B
NEW QUESTION 12
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SUM with DMO
- B. SWPM using the Load procedure
- C. SUM without DMO
- D. SWPM using the Backup / Restore procedure
Answer: B
NEW QUESTION 13
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Uninstall industry extensions not supported by SAP S/4HANA
- B. Delete client 066 (Early Watch Client)
- C. Uninstall Fiori apps not released for SAP_UI 7.50
- D. Install add-on SAP Gateway 7.50
Answer: B,C
NEW QUESTION 14
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages found in the download directory
- B. The SAP Support Packages that will be bound to the upgrade
- C. The SAP Support Packages contained in the upgrade media
- D. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
Answer: A
NEW QUESTION 15
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
- B. Unicode conversion Database migration SAP S/4HANA conversion without database migration
- C. Unicode conversion SAP S/4HANA conversion without database migration Database migration
- D. Unicode conversion SAP S/4HANA conversion including database migration
- E. SAP S/4HANA conversion including database migration and Unicode conversion
Answer: A,B,D
NEW QUESTION 16
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Conversion
- B. Main import
- C. Software update
- D. Migration
Answer: A,D
NEW QUESTION 17
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
- A. The end of the database migration
- B. The start of the business downtime
- C. The end of the business downtime
- D. The start of the Execution roadmap step
Answer: C
NEW QUESTION 18
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Shadow repository creation (EU_IMPORT*)
- B. Downtime migration (EU_CLONE_MIG_DT_RUN)
- C. Uptime migration (EU_CLONE_MIG_UT_RUN)
- D. ParaUel distribution (PARDIST_SHD)
Answer: C
NEW QUESTION 19
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.
- A. Unicode conversion
- B. Database migration
- C. Software update
- D. Custom code analysis
Answer: B,C
NEW QUESTION 20
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?
- A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
- B. AA
Answer: A
NEW QUESTION 21
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
- D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
Answer: C
NEW QUESTION 22
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of user DDIC in the development client of the development system
- B. Credentials of a named user in the development client of the development system
- C. Credentials of a named user in client 000 of the shadow system
- D. Credentials of user DDIC in client 000 of the shadow system
Answer: B
NEW QUESTION 23
In ICNV. How database operations synchronized between the source and the target table?
- A. AA
- B. Deletes are directly executed in the target table by delete trigger.
Answer: B
NEW QUESTION 24
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE_MIG_SOT_RUN
- B. EU_CLONE_MIG_DT_RUN
- C. EU_IMPORT_ALL
- D. EU_CLONE_MIG_DT_CREATE
Answer: B
NEW QUESTION 25
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Reuse a profile for the shadow instance from a previous run.
- B. Keep archiving on during the whole procedure.
- C. Choose the instance number of the shadow instance.
- D. Use the Near Zero Downtime Maintenance Technology (NZDM).
Answer: A,C
NEW QUESTION 26
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Using DMO when applying Support Packages to SAP ECC 6.07
- B. Upgrading to SAP ECC 6.08 without using DMO
- C. Updating to SAP ECC 6.07 using DMO
- D. SAP S/4HANA conversion to SAP S/4HANA 1709
Answer: B,D
NEW QUESTION 27
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Execution of eCATTs for business validation tests
- B. Execution of SPAU modification adjustment
- C. Execution of XPRAs and AIMs
- D. Creation of the table structures in the new SAP HANA database
- E. Execution of SPDD modification adjustment
Answer: A,B,C
NEW QUESTION 28
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
Answer: A
NEW QUESTION 29
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.
- A. Apply the corresponding SAP note via SAP Note Assistant
- B. Download it from SAP Support Portal
- C. Generate it by analyzing the specific custom code via RFC
- D. Configure it within transaction ATC
Answer: B
NEW QUESTION 30
......
Check the Free demo of our E-S4HCON2022 Exam Dumps with 72 Questions: https://exam-labs.itpassleader.com/SAP/E-S4HCON2022-dumps-pass-exam.html