NEW QUESTION # 75
Shift is one of the key elements in defining project and resource calendars.
Which two additional key elements are required to define the project and resource calendars? (Choose two.)
- A. Time off
- B. Expenditure Type
- C. Workday Patterns
- D. Schedule Exceptions
- E. Accounting Calendar
Answer: C,D
Explanation:
Shift is one of the key elements in defining project and resource calendars. Two additional key elements that are required to define the project and resource calendars are:
* Schedule Exceptions: These are dates or periods that override the regular workday patterns and shifts of a calendar. They can be used to define holidays, vacations, or other special events that affect the availability of resources or projects.
* Workday Patterns: These are patterns of working and nonworking days that repeat over a period of time. They can be used to define the standard working days and hours for a calendar. Time off, expenditure type, and accounting calendar are not key elements in defining project and resource calendars. Time off is an attribute of a resource assignment that reduces the availability of a resource.
Expenditure type is a classification of costs that determines how they are processed and accounted.
Accounting calendar is a calendar that defines the accounting periods and dates for transactions.
Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage- project-resources.html#OAPFM2356131
NEW QUESTION # 76
Which application generates external roles to grant both function and data security? (Choose the best answer
.)
- A. Oracle Identity Manager
- B. Business Process Manager
- C. Functional Setup Manager
- D. Authorization Policy Manager
Answer: A
Explanation:
Authorization Policy Manager (APM)
APM greatly simplifies the creation, configuration, and administration of application policies APM does not support the management of users and external roles; these artifacts can only be viewed with the tool. Their provision and management is typically accomplished using Oracle Identity Manager Oracle Identity Manager (OIM) In regard to enterprise users and external roles, Authorization Policy Manager provides viewing and searching functionality only. To manage users and external roles, use Oracle Identity Manager or some other identity management tool.
OIM provision users, roles, and defines what a user can do in Oracle Cloud Duty Roles are mapped to jobs and assigned access privileges (Data Security)
NEW QUESTION # 77
Identify three purposes for which the project resource search index is used. (Choose three.)
- A. Calculate Resource Qualification Scores
- B. Calculate Resources Availability Scores
- C. Filter counts while you search for resources
- D. Provide absence details for resources
- E. Display resource details
Answer: A,C,E
Explanation:
The project resource search index is used to store and retrieve information about project resources such as their availability, qualifications, preferences, etc. The project resource search index is used for three purposes:
* Display resource details: The project resource search index provides the resource details such as name, email, job title, organization, etc. that are displayed on the resource search page.
* Filter counts while you search for resources: The project resource search index provides the filter counts that show how many resources match each filter criterion on the resource search page.
* Calculate Resource Qualification Scores: The project resource search index provides the qualification information such as skills, certifications, languages, etc. that are used to calculate the Resource Qualification Scores for each resource based on their match with the resource request. The project resource search index does not provide absence details for resources or calculate Resource Availability Scores. These are provided by other components such as Oracle Fusion Absence Management and Oracle Fusion Human Capital Management. Reference: https://docs.oracle.com/en/cloud/saas/project- portfolio-management/20c/oapfm/manage-project-resources.html#OAPFM2356181
NEW QUESTION # 78
In a Project Draft Invoice preview, quantity (hours) and unit price (bill rate) are shown as fields on the invoice. Quantity and unit price are then used to calculate the line total, then the total price of the invoice.
After the invoice is transferred or created in Receivables, the invoice detail has a quantity of 1, and a unit price equal to the line total. The detailed Unit Price/Quantity does not come through on the Receivables invoice.
Identify the correct statement about details in the receivables invoice. (Choose the best answer.)
- A. The project sends only the invoice header to Receivables, not the invoice line description and distributions.
- B. The project sends the invoice header, invoice line description, and the invoice distributions to Receivables.
- C. The project sends only the invoice header and invoice line description to Receivables, not the invoice distributions.
- D. The project sends the invoice line description and the invoice distributions to Receivables, but not the invoice header.
Answer: C
Explanation:
When a project invoice is transferred or created in Receivables, the project sends only the invoice header and invoice line description to Receivables, not the invoice distributions. The invoice distributions contain the detailed information such as quantity, unit price, and line total. Therefore, the Receivables invoice does not show these details, but only shows a quantity of 1 and a unit price equal to the line total. Reference:
https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-invoices.
html#OAPFM2355931
NEW QUESTION # 79
Identify three correct statements about project types. (Choose three.)
- A. Project type can be associated with multiple project units.
- B. Project type can be used as a source in subledger accounting.
- C. Project type can be enabled for both billing and capitalization.
- D. Classifications can be assigned at project type.
- E. Summarization options can be specified at project type.
Answer: A,B,E
Explanation:
Project type is a classification that defines the common attributes and processing options for projects. Some of the correct statements about project type are:
* Project type can be used as a source in subledger accounting. This allows you to create accounting rules based on the project type attribute.
* Summarization options can be specified at project type. This allows you to control how the project transactions are summarized for reporting and performance purposes.
* Project type can be associated with multiple project units. This allows you to share the same project type across different business units or organizations. Project type cannot be enabled for both billing and capitalization, as these are mutually exclusive options. Classifications cannot be assigned at project type, but at project or task level. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/set-up-project-financial-management.html#OAPFM2355971
NEW QUESTION # 80
You have a billable project for which the following details are provided:
Associated Inception-To-Date (ITD) Project Actual Cost: USD 60
Associated Project Budgeted Cost: USD 300
Contract Amount: USD 1000
Project Funded Amount: USD 750
Sum of Existing Revenue Events: USD 80
Identify the Associated Project Spent revenue that will get generated based on the preceding details. (Choose the best answer.)
- A. USD 120
- B. USD 70
- C. USD 184
- D. USD 134
Answer: B
Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapjb/manage-project-contract- revenue.html#OAPJB164173 Associated Project Percent Spent Example The following formula calculates the percent spent revenue for the associated project.
((Sum of ITD Actual Cost for every subtask that is part of the associated task / Sum of Total Budgeted cost for every task that is part of associated task) x Associated Project Funded Amount) - Sum of Existing Invoice Event Amounts for the Associated Project ((60/300) x 750) - 80 = 70 ((Actual Cost / Budgeted Cost) x Budgeted Revenue) - Sum of Revenue Event Amount
NEW QUESTION # 81
Which two statements are true about the borrowed and lent cross charge method? (Choose two.)
- A. Internal Invoice is not generated with this method.
- B. This method allows you to process cross charge transactions across legal entities.
- C. You must set up a contract business unit to use this method.
- D. This method creates accounting entries that move an amount equal to the transfer price between the provider and receiver organizations
Answer: A,B
Explanation:
The borrowed and lent cross charge method is a method that allows you to process cross charge transactions between provider and receiver organizations that belong to different legal entities within the same primary ledger. This method does not generate internal invoices or intercompany accounting entries for cross charge transactions. Instead, this method creates accounting entries that move an amount equal to the transfer price between the provider and receiver organizations using borrowed and lent accounts. Two statements that are true about this method are:
* Internal Invoice is not generated with this method. This method does not create internal invoices for cross charge transactions, as these transactions are accounted within the same primary ledger using borrowed and lent accounts.
* This method allows you to process cross charge transactions across legal entities. This method allows you to process cross charge transactions between provider and receiver organizations that belong to different legal entities within the same primary ledger, as long as they share the same chart of accounts, calendar, currency, and subledger accounting method.
NEW QUESTION # 82
Which three Cost Collection Flexfield core attributes can be derived during import if not explicitly entered in a transaction document? (Choose three.)
- A. Expenditure Type
- B. Billable Flag
- C. Capitalizable Flag
- D. Work Type
- E. Funding Source
Answer: A,B,C
Explanation:
The Cost Collection Flexfield is a descriptive flexfield that captures additional information about project costs. It has three core attributes that are required for every cost transaction: Billable Flag, Expenditure Type, and Capitalizable Flag. These attributes can be derived during import if not explicitly entered in a transaction document, based on various rules and sources such as expenditure type defaults, project type defaults, transaction source defaults, etc. Funding Source and Work Type are not core attributes of the Cost Collection Flexfield, but context-sensitive segments that can be optionally enabled for certain transaction sources or business units. These segments capture additional information about how the costs are funded or what type of work is performed. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm
/manage-project-costs.html#OAPFM2356141
NEW QUESTION # 83
Your customer wants to assign the Net 45 payment term to all sets except for the corporate business unit specific set, which is assigned the Net 15 payment term. At transaction entry, the list of values for payment terms consists of only one set of data: the set that is assigned to the transaction's business unit.
Which reference data sharing method would you set up to meet the customer requirement? (Choose the best answer.)
- A. assignment to one set only; no common values allowed
- B. assignment to multiple sets; common values allowed
- C. assignment to multiple sets; no common values allowed
- D. assignment to one set only with common values
Answer: C
Explanation:
Reference https://docs.oracle.com/en/cloud/saas/applications-common/19b/facia/define-enterprise-structures.
html#FACIA462453
Reference Data Sharing Methods
Variations exist in the methods used to share data in reference data sets across different types of objects. The following list identifies the methods:
Assignment to one set only, no common values allowed. This method is the simplest form of sharing reference data that allows assigning a reference data object instance to one and only one set. For example, Asset Prorate Conventions are defined and assigned to only one reference data set. This set can be shared across multiple asset books, but all the values are contained only in this one set.
Assignment to one set only, with common values. This method is the most commonly used method of sharing reference data that allows defining reference data object instance across all sets. For example, Receivables Transaction Types are assigned to a common set that is available to all the business units. You need not explicitly assign the transaction types to each business unit. In addition, you can assign a business unit-specific set of transaction types. At transaction entry, the list of values for transaction types includes the following:
Transaction types from the set assigned to the business unit.
Transaction types assigned to the common set that is shared across all business units.
Assignment to multiple sets, no common values allowed. The method of sharing reference data that allows a reference data object instance to be assigned to multiple sets. For instance, Payables Payment Terms use this method. It means that each payment term can be assigned to one or more than one set. For example, you assign the payment term Net 30 to several sets but assign Net 15 to a set specific only to your business unit.
At transaction entry, the list of values for payment terms consists of only the set that is assigned to the transaction's business unit.
Note: Oracle Fusion Applications contains a reference data set called Enterprise. Define any reference data that affects your entire enterprise in this set. Also update the data set going forward as you create new reference data items.
NEW QUESTION # 84
You create a project schedule with a Shifts element. Identify two more elements that can be part of a project schedule. (Choose two.)
- A. Exceptions
- B. Expenditure Type
- C. Workday Patterns
- D. Accounting Calendar
- E. Time Off
Answer: A,C
Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/FAPFM/FAPFM1192914.htm Topic - Creating Calendars for Projects and Resources: Procedure Project Schedules are used as a base for project and resource calendars in Project Execution Management applications. The smallest scheduling unit is a day. For example, you can define the number of hours in a day but, you can't schedule work for a specific time of the day.
The following are the elements of a schedule:
* Shifts
* Workday patterns
* Exceptions
NEW QUESTION # 85
You have defined two expenditure types, but they are not available for selection when you enter an expenditure batch. Identify the reason for this problem. (Choose the best answer.)
- A. The two expenditure types are not assigned to the reference data set that is assigned to the business unit in which the transaction is performed.
- B. The two expenditure types are not assigned to the reference data set that is assigned to the project- owning organization in which the transaction is performed.
- C. The two expenditure types are not assigned to the reference data set that is assigned to the project unit in which the transaction is performed.
- D. The two expenditure types are not assigned to the reference data set that is assigned to the project expenditure organization in which the transaction is performed.
Answer: C
Explanation:
Ref: Implementing-Project-Financial-Management-and-Grants-Management.pdf (19A Part # F11256-01) Chapter 3 - Define Project Organizations Topic - Set Assignments and Project Data - How They Work Together (Page 29) Business Unit as Set Determinant Business units enable you to control and report on financial transactions, usually for specific geographical entities within the enterprise. For project management purposes, assign the Project Accounting business function to the business unit.
Business unit is a set determinant for the project-related reference data objects described in the following table.
Ref Data Object
Entities
Project Accounting Definition
Project Types
Project Rates
Project rate schedules
Project Unit as Set Determinant
Use project units to enforce consistent project management practices across your enterprise. Project unit is a set determinant for the reference data objects described in the following table.
Ref Data Object
Entities
Project Definition
Class codes, financial plan types, project plan types and project roles Project Transaction Types Expenditure types and work types You can only select class codes, plan types, roles, expenditure types and work types that are assigned to the same set as the project unit. To enable expenditure types and work types for use on projects owned by a project unit, assign the set associated with the Project Transaction Types reference data object to those entities
NEW QUESTION # 86
Your organization has a requirement to retrieve the value of the cost center segment based on the department.
Which source can you use while defining the account rule to achieve this requirement?
- A. Event Organization Cost Center Segment
- B. Expenditure Business Unit Cost Center Segment
- C. Expenditure Organization Cost Center Segment
- D. Project Organization Cost Center Segment
Answer: C
Explanation:
The source that can be used while defining the account rule to achieve this requirement is Expenditure Organization Cost Center Segment. This source allows you to retrieve the value of the cost center segment based on the expenditure organization of the transaction. The expenditure organization is an attribute of a transaction that represents the organization that incurs or owns the cost of the transaction.
NEW QUESTION # 87
Which two statements describe how the Resource Qualification Score is calculated?
- A. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification.
- B. An individual's score is 100% if the resource request has a qualification, but no proficiency is specified, and the resource has the qualification.
- C. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency.
- D. An individual's score is 100% if the resource request has a qualification with a specified proficiency and the resource has the qualification with a proficiency that is lower or higher than specified.
Answer: B,C
Explanation:
The Resource Qualification Score is a percentage that indicates how well an individual matches the qualifications required for a resource request. An individual's score is 100% if either of the following conditions are met:
* The resource request has a qualification, but no proficiency is specified, and the resource has the qualification. This means that any level of proficiency is acceptable for the qualification.
* The resource request has a qualification with a specified proficiency and the resource has the qualification that meets the specified proficiency. This means that the resource has the exact level of proficiency required for the qualification. An individual's score is not 100% if the resource request has a qualification with a specified proficiency and the resource does not have the qualification or has a different level of proficiency than required. In this case, the score is calculated based on how close the resource's proficiency is to the required proficiency. Reference: https://docs.oracle.com/en/cloud/saas
/project-portfolio-management/20c/oapfm/manage-project-resources.html#OAPFM2356001
NEW QUESTION # 88
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes in HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers. (Choose the best answer.)
- A. Jobs
- B. attributes that the project enterprise resources are assigned after creation
- C. Pool Membership
- D. Person Type
Answer: D
Explanation:
Reference https://docs.oracle.com/cloud/farel8/projectcs_gs/OAPEX/F1082603AN23E61.htm Manage Project Enterprise Labor Resource Maintenance Conditions Project Enterprise Labor Resources: How They Are Automatically Created and Maintained Run the Maintain Project Enterprise Labor Resources process to create resources, remove resource availability for staffing, and maintain the resource search index.
Settings That Affect the Maintain Project Enterprise Labor Resources Process Create and maintain project enterprise labor resources by defining a set of conditions that specify the employees and contingent workers in Oracle Fusion Human Capital Management (HCM) to create as resources in Oracle Fusion Project Portfolio Management. Define the resource attribute values, such as the resource calendar and primary project role, to assign to the new resources.
The following table lists the criteria that you define for selecting HCM persons to create as project enterprise labor resources.
Selection Criteria
Description
Person type
Select the HCM person type for the process to use as criteria when selecting HCM persons to create as resources. Available person types are employees, contingent workers, or both employees and contingent workers.
Option to select people based on job
Select this option for the process to create resources for HCM persons with specific jobs.
Caution If you do not select job criteria for this condition, the process will create resources for all eligible people based only on the person type.
Jobs
If you selected the option to select people based on job, then select the jobs for the process to use as HCM person selection criteria.
The following table lists the attributes for which you specify values to assign to resources that are created for the condition.
Resource Attribute
Description
Option to manage resource availability and staffing
Select this option for resource managers to manage the availability and project staffing of resources who are created based on the condition. Resources who are managed in Oracle Fusion Project Resource Management are eligible to fulfill project resource requests.
Calendar
Select the resource calendar for resources that are created based on the condition. The resource calendar defines the work schedule for project enterprise labor resources, and includes working days and hours and any exceptions, such as holidays.
Primary project role
Select the primary project role for resources that are created based on the condition. Project roles are maintained in Oracle Fusion Project Management.
Cost rate and currency
Enter the cost rate and currency for resources that are created based on the condition.
Bill rate and currency
Enter the bill rate and currency for resources that are created based on the condition.
NEW QUESTION # 89
Which data format is supported by SOAP Web services to establish communication between web services consumers and web services providers?
- A. JSON
- B. XML
- C. XLSX
- D. CSV
Answer: B
Explanation:
XML (Extensible Markup Language) is the data format that is supported by SOAP (Simple Object Access Protocol) Web services to establish communication between web services consumers and web services providers. XML is a standard format that allows data to be exchanged across different platforms and applications. SOAP Web services use XML to encode the messages and data that are sent and received between the web services endpoints. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/integrate-project-financial-management.html#OAPFM2356071
NEW QUESTION # 90
In your customer site, the capitalized interest calculation is implemented on their project types. Which option represents the costs considered in the interest calculation? (Choose the best answer.)
- A. expenditure type exclusions on the Capitalized Interest rate name
- B. common costs on the project/task
- C. expenditure type exclusions on the Capitalized Interest rate schedules
- D. expenditure items whose costs are applied to a single asset or multiple assets
- E. expenditure items whose cost spreads across multiple assets that are capitalized
Answer: D
Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic
/TopicId_P_988B43C997365159E040D30A68813832
https://docs.oracle.com/cd/E48434_01/fusionapps.1118/e49622/F1125377AN61D92.htm
NEW QUESTION # 91
A consulting services company is currently working on a business transformation project for your client that spans over 10 months. The total contract amount is 250000 USD. They have generated a revenue of 25000 USD and an Invoice of 10000 USD at the end of the first period.
The accounting entry for revenue is:
and accounting entry for invoice is:
What will be the accounting entry when you reclassify the billing offset balances in the first period?
- A. Dr Deferred Revenue 10000 -
Cr Unbilled Receivables 10000 - B. Dr Unbilled Receivables 10000 -
Cr Accounts Receivables 10000 - C. Dr Accounts Receivables 10000 -
Cr Unbilled Receivables 10000 - D. Dr Accounts Receivables 10000 -
Cr Revenue 10000
Answer: C
Explanation:
When you reclassify the billing offset balances in the first period, the accounting entry is:
Dr Accounts Receivables 10000 - Cr Unbilled Receivables 10000
This entry reduces the unbilled receivables balance and increases the accounts receivables balance by the invoice amount. This is because the invoice has been created and sent to the customer, and the billing offset account is no longer needed. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio-management
/20c/oapfm/manage-project-invoices.html#OAPFM2356091
NEW QUESTION # 92
Stigma consulting has been hired by a client to implement Project Management Cloud. Which role should they assign to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook?
- A. Project Executive
- B. Project Administrator
- C. Project Application Administrator
- D. Project Integration Specialist
Answer: D
Explanation:
The Project Integration Specialist role should be assigned to a user for using the rapid implementation feature to set up the Project Financial Management offering by populating and uploading a Microsoft Excel workbook. This role allows the user to access the Functional Setup Manager and perform the common setups for project costing and billing using predefined templates and spreadsheets. The user can also monitor and validate the setup data using reports and dashboards. Reference: https://docs.oracle.com/en/cloud/saas/project- portfolio-management/20c/oapfm/implement-project-financial-management-applications.
html#OAPFM2356151
NEW QUESTION # 93
Your client is involved in automation control systems installation. Over the years, they have analyzed their total project spend on specific resource classes. They have identified that their cost spread distribution factor on a 10 spread point scale resembles:
0-4-10-11-14-13-10-4-0-0. Identify two ways to handle this kind of a spread on their budgets and forecasts. ( Choose two)
- A. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to a project template.
- B. Use the predefined Bell Curve spread with small deviations on the spread points.
- C. Create a new spread curve or edit an existing spread curve to exactly match the spread points and attach to the resource class.
- D. Use the predefined S-Curve spread with small deviations on the spread points.
Answer: A,C
Explanation:
To handle a custom spread on budgets and forecasts, you can either create a new spread curve or edit an existing one to match the desired spread points. Then, you can attach the spread curve to a project template or a resource class, depending on whether you want to apply it to all projects using that template or all transactions using that resource class. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/define-project-budgets-and-forecasts.html#OAPFM2355819
NEW QUESTION # 94
You are trying to create a custom infolet but are not able to find the "Create Infolet" option in the Infolet repository window. Which two steps should be completed before you can access the "Create Infolet" option?
- A. You must be in an active sandbox.
- B. You must activate Page Composer.
- C. You should be on the Project Custom Objects page.
- D. You should enable the "Create Infolet" option from the Personalize Springboard page.
Answer: A,B
Explanation:
Ref: https://docs.oracle.com/cd/E83857_01/saas/applications-common/18b/oaext/page-modification.
html#OAEXT1640891
NEW QUESTION # 95
Identify the precedence order in which cost rates are determined for a planning resource when deriving raw costs for rate-based planning resources. (Choose the best answer.)
- A. Resource class rate schedule > Override rate > Job rate schedule > Person rate schedule
- B. Override rate > Person rate schedule > Job rate schedule > Resource class rate schedule
- C. Override rate > Job rate schedule > Resource class rate schedule > Person rate schedule
- D. Job rate schedule > Resource class rate schedule > Override rate > Person rate schedule
- E. Person rate schedule > Job rate schedule > Resource class rate schedule > Override rate
Answer: B
Explanation:
Reference https://fusionhelp.oracle.com/helpPortal/topic
/TopicId_P_8718794B26A7BB93E040D30A688149A3
NEW QUESTION # 96
Select two correct statements about project classifications on a template. (Choose two.)
- A. When a project is created from a template, the required project classifications must be entered.
- B. Project class category in a project classification must be associated with a Set Code.
- C. Set Code is not required for a project class category in a project classification.
- D. Project Classification is a mandatory field on a project template.
Answer: A,B
Explanation:
Project classifications are used to group and report on projects based on different criteria. A project template can have one or more project classifications, which can be either required or optional. When a project is created from a template, the required project classifications must be entered, while the optional ones can be left blank. A project class category in a project classification must be associated with a set code, which determines the list of values for the project class. Project classification is not a mandatory field on a project template, but it is recommended to use it for reporting purposes. Reference: https://docs.oracle.com/en/cloud
/saas/project-portfolio-management/20c/oapfm/manage-project-plans.html#OAPFM2355961
NEW QUESTION # 97
Green House Corporation has decided to enable the budgetary control feature for their projects. At which two levels will they be able to enter the amounts in the budget versions for these projects?
(Choose two.)
- A. Expenditure Category
- B. Expenditure Type
- C. Project
- D. Top resource
- E. Task
Answer: C,E
Explanation:
Budgetary control is a feature that allows you to monitor and control project costs against approved budgets.
You can enter the amounts in the budget versions for these projects at two levels: Task and Project. These levels correspond to the budgetary control levels that are defined for the project type. You can also view and compare the budget amounts and actual costs at these levels using reports and dashboards. Expenditure Type, Top Resource, and Expenditure Category are not levels at which you can enter the amounts in the budget versions for these projects. These are attributes that can be used to group and filter the budget and actual amounts for reporting purposes. Reference: https://docs.oracle.com/en/cloud/saas/project-portfolio- management/20c/oapfm/manage-project-budgets-and-forecasts.html#OAPFM2356191
NEW QUESTION # 98
......
Prepare for the Actual Project Financials Management Cloud 1z0-1057-25 Exam Practice Materials Collection: https://exam-labs.itpassleader.com/Oracle/1z0-1057-25-dumps-pass-exam.html